Such kind of boring is needed to the people who want to get 50,000 to 500,000 gallons of water daily. Industrial drilling have three types of dia and it may be up to 1,000 feet deep.
1 ) 8 inches
2 ) 12 inches
3 ) 15 inches
If you want to have the 15 inches boring you will still need to have 8 inches boring than it will be expanded into 12 inches and finally into 15 inches. Industrial boring cost depends on the depth and dia. There are three threshold of depth in terms of cost..
BORING DEPTH.
1 ) 00 to 600 feet
2 ) 600 to 800 feet
3 ) 800 to 1,000 feet
SHIFTING OF RIG & EQUIPMENTS RS. 20,000.
Shifting of Drilling up equipment & personnel and setting up equipment at bore point, setting up temporary camp, setting of Rig over bore point.
BORING COST (8 INCHES DIA)
1 ) 00 to 600 feet.• Cost: Rs 600/= per feet
• Type-PVC-“D” & “E” class
• Cost: Rs 150/= per feet
• Silica Gravel as per required grading size
Provision & installation of submersible pump Grundfos (Italian) make refurbish with motor 25 HP including following accessories as desired below
i. PUMP & MOTOR
Quantity: 1
Cost: Rs. 500,000
ii. GI PIPES 2” DIA WITH FLANGES ATTACHED.
Quantity: as per need
Cost: Rs. 400/= per feet
iii. MOTOR CONTROL UNIT. 30 HP
Quantity: 1
Cost: Rs. 40,000/=
iv. CABLE 3 CORE FLAT.
Quantity: as per need
Cost: Rs. 220/= per feet
v. TAIL PIECE.
Quantity: 1
Cost: Rs. 5,000/=
vi. BORE COVER PLATE.
Quantity: 1
Cost: Rs. 5,000/=
vii. TOP BAND.
Quantity: 1
Cost: Rs. 5,000/=
viii. CLAMP.
Quantity: 2
Cost: Rs. 5,000/=
ix. PACKING SHEET.
Quantity: 1 packet
Cost: Rs. 3,000/=
x. NUT BOLTS (SS).
Quantity: 200 No’s
Cost: Rs. 100/= per nut bolt
xi. SS WIRE ROPE TO HOLD PUMP.
Quantity: as per need
Cost: Rs. 110/= per feet
xii. INSTALLATION CHARGES.
Quantity: 1 job
Cost: Rs. 20,000/= SERVICES
1. STRATA SAMPLING
Geological strata sample collection at 10 feet interval or change of strata and preserving & its sieve analysis.
Quantity: 100
Cost: Rs. 200/= each
2. CASING INSTALLATION.
Tube well casing installation / lowering into bore hole. (Service Only).
Cost: Rs. 30/= per feet
3. YIELD TEST.
Yield test by air compressor / pump at any depth to 1000 ft depth max: to check quantity / quality of water and collection of water samples.
Quantity: 1 job
Cost: Rs. 60,000/=
4. GRAVEL.
Gravel (Silica sand stone) packing with fine graded well screened and fed into annulus space with continuous circulation of water into the well casing through sampling pipes.
Cost: Rs 30/= per feet
Development of tube well by compressor / pump till water becomes clear free of silt, sand & mud.
Cost: Rs. 50,000/=
1) Booking token Rs.10,000/= (In advance)
2) Shifting of rig & equipment Rs. 20,000/= (In advance)
3) 50% Boring charges in advance with service order
4) 25% after 4 days of starting of work.
5) 100 % amount of Material i.e. PVC pipes & Silica Gravels to purchase the material
6) Balance amount after completion of work
7) Given rates are excluded of withholding tax and GST.
1) Mobilization of Drilling Rig & Crew 15 Days (Maximum)
2) Setting up time for rig 02 Days
3) Drilling time 30 Days (Maximum)
4) Development of Tube well by compressor 02 Days
5) Report for completion of work 02 Days. Azad Boring Team officials.
1) Boring dia 6 inches, casing dia 4 inches.
2) Boring dia 8 inches, casing dia 6 inches.
1) Traditional type Including generator.
1) 10 to 15 days.
1) Boring.
2) Casing installation (casing will be provided by the customer)
3) Bore Cleaning
1) Casings.
2) Gravel.
3) Pumps & Pipe
1) Boring machine shifting charges: Rs. 5000/=.
2) Boring charges Rs. 600 per feet approximately (Final rate will be informed after the site survey).
Azad Boring Team officials.